- DESIGN 3 / INDA International Program / Chulalongkorn faculty of architecure / BANGKOK - The studio follows the general brief and schedule given to all second year students.
Search This Blog
20101117
review's comments
Students having production problems and who are late:
Ong (critical situation), Eiab (entering very dangerous situation), Enn (extremely late), Cherry, Best, Grace and Ton.
Students having presentation problems:
Eiab (yesterday's presentation was NOT ACCEPTABLE), Amy (yesterday's presentation was NOT ACCEPTABLE), Ong, Enn, Ton and Geng.
Re-work on your presentation according to the comments made yesterday and post on the blog before Friday in order to have a constructive tutorial. (no work done - no tutorial)
All students mentioned above have to produce consistent and continuous efforts until the end of the semester.
To all,
_ You have to produce drawings and print them at a large scale for Friday (+ models at scale 1:50) - I repeat myself for the last time, i will not look at computer screens.
_ Make your personal timetable of the week and a half left until the end of production (all production will stop on Monday 29, the final review will start the following Tuesday 30). Timetable starting yesterday, with documents and models you aim to produce and the necessary time you will spend to produce each one of them.
You need to master time, and not be a victim of it, and one efficient way is to clearly be aware of the amount of time left and to plan it before.
_ The site model is now in a catastrophic state. Complete it and add the vegetation and store it in a proper place before Friday. Think that you can use it for your final presentation, it needs to look good!
I was generally disappointed yesterday by the amount and quality of your work (students mentioned above).
Time to react!
Ong (critical situation), Eiab (entering very dangerous situation), Enn (extremely late), Cherry, Best, Grace and Ton.
Students having presentation problems:
Eiab (yesterday's presentation was NOT ACCEPTABLE), Amy (yesterday's presentation was NOT ACCEPTABLE), Ong, Enn, Ton and Geng.
Re-work on your presentation according to the comments made yesterday and post on the blog before Friday in order to have a constructive tutorial. (no work done - no tutorial)
All students mentioned above have to produce consistent and continuous efforts until the end of the semester.
To all,
_ You have to produce drawings and print them at a large scale for Friday (+ models at scale 1:50) - I repeat myself for the last time, i will not look at computer screens.
_ Make your personal timetable of the week and a half left until the end of production (all production will stop on Monday 29, the final review will start the following Tuesday 30). Timetable starting yesterday, with documents and models you aim to produce and the necessary time you will spend to produce each one of them.
You need to master time, and not be a victim of it, and one efficient way is to clearly be aware of the amount of time left and to plan it before.
_ The site model is now in a catastrophic state. Complete it and add the vegetation and store it in a proper place before Friday. Think that you can use it for your final presentation, it needs to look good!
I was generally disappointed yesterday by the amount and quality of your work (students mentioned above).
Time to react!
Subscribe to:
Posts (Atom)